Wantong Center

No189,Daguan Road

Basic Information

District
Gongshu
Circle
GongChenQiao
Year Built
2014
Total Buildings
5
Total Units
1201
Parking Spaces
499
Property Management
Beijing Wanhao Ding'an International Property Service Co., Ltd. Hangzhou Branch
Greening Rate
30%
Size Range
89-120 sqm m²
Available Types
3 brs
Developer

About This Compound

1. Compound built in 2018.
2. The compound features in total 10 buildings with service apartment and apartment, the main layout is 3 bedrooms apartment, the size is from 89 sqm to 120 sqm, which is decorated by the developer.
3. The metro station Chuang Jing Road station is 200m away from compound.
4. There is an EFC life near the compound, which you can find shops, restaurants etc

Location & Transportation

Nearby Metro Stations

Station Line Distance Walk Time
Daxuan Metro Station Exit C1 Line 3 109 m ≈ 1min
Biguan Metro Station Exit C2 Line 3 136 m ≈ 1min
Da Guan Metro Station Exit D2 Line 3 197 m ≈ 2min
Da Guan Station Line 3 210 m ≈ 2min
Da Guan Metro Station Exit D1 Line 3 218 m ≈ 2min
Da Guan Metro Station Exit B Line 3 248 m ≈ 3min
Da Guan Metro Station Exit A Line 3 290 m ≈ 3min
Xiangji Temple Metro Station Exit A Line 3 822 m ≈ 10min
Xiangji Temple Metro Station Exit B Line 3 847 m ≈ 10min
Gongchen Bridge East Metro Station Exit C Line 5 923 m ≈ 11min
Xi An Temple Station Line 3 930 m ≈ 11min
Xiangji Temple Metro Station Entrance Line 3 946 m ≈ 11min
Qingchen Bridge East Metro Station Exit D Line 5 980 m ≈ 12min
Gongchen Bridge East Station Line 5 989 m ≈ 12min
Qian Cheng Bridge East Metro Station Exit B Line 5 1003 m ≈ 12min
Xi'an Museum Metro Station Exit D Line 3 1005 m ≈ 12min
Gongchen Bridge East Metro Station Exit A Line 5 1015 m ≈ 12min
Xiangji Temple Metro Station Exit C Line 3 1016 m ≈ 12min
Qī Gǔ Dēng Station Under Construction Line 15 1282 m ≈ 16min
Shan Xian Metro Station Exit D1 Line 5 1459 m ≈ 18min

Available Properties