Wantong Center
Gongshu •
Wantong Center
(Wantor Center / zhè jiāng shěng háng zhōu shì gǒng shù qū wàn tōng zhōng xīn)
Property Description
small sized studio apartment , in great location
Property Highlights
Basic Information
| Floor: | high |
| Building Type: | High-rise |
| Orientation: | South |
Rental Terms
| Deposit: | ¥2700 |
| Management Fee: | ¥0 |
| Payment Terms: | Monthly payment |
| Furniture: | Complete furniture |
Amenities & Facilities
Wantong Center
Wantor Center / zhè jiāng shěng háng zhōu shì gǒng shù qū wàn tōng zhōng xīn
Learn More About This Compound| Community: | |
| Address: | , , |
| Year Built: | 2014 |
| Total Buildings: | 5 |
| Total Units: | 1201 |
| Parking Spaces: | 499 |
| Management Fee: | ¥0/m² |
| Developer: |
Neighborhood Information
Gongchenqiao Subdistrict is named after the Ming Dynasty stone arch bridge that spans the canal. It was established in August 1954 and is a subdistrict under the jurisdiction of Gongshu District, Hangzhou City. Gongchenqiao Subdistrict is located in the central-northern part of Gongshu District, Hangzhou City. It is the location of the Gongshu District Committee and District Government. The Beijing-Hangzhou Grand Canal runs through the jurisdiction, dividing the subdistrict into the east and west sides. The eastern part is adjacent to Shangtang Subdistrict in the north and Shangtang Subdistrict in the east, while the western part connects with Xiangfu Subdistrict and Hemu Subdistrict, and the south is linked to Xiaohe Subdistrict.
Nearby Metro Stations
| Station | Line | Distance | Walk Time | Coordinates |
|---|---|---|---|---|
| Daxuan Metro Station Exit C1 | Line 3 | 109 m | ≈ 1min | 120.148099, 30.307949 |
| Biguan Metro Station Exit C2 | Line 3 | 136 m | ≈ 1min | 120.147223, 30.306991 |
| Da Guan Metro Station Exit D2 | Line 3 | 197 m | ≈ 2min | 120.147513, 30.306479 |
| Da Guan Station | Line 3 | 210 m | ≈ 2min | 120.149143, 30.307815 |
| Da Guan Metro Station Exit D1 | Line 3 | 218 m | ≈ 2min | 120.148638, 30.306841 |
| Da Guan Metro Station Exit B | Line 3 | 248 m | ≈ 3min | 120.149585, 30.308373 |
| Da Guan Metro Station Exit A | Line 3 | 290 m | ≈ 3min | 120.150023, 30.308080 |
| Xiangji Temple Metro Station Exit A | Line 3 | 822 m | ≈ 10min | 120.148296, 30.300887 |
| Xiangji Temple Metro Station Exit B | Line 3 | 847 m | ≈ 10min | 120.147975, 30.300627 |
| Gongchen Bridge East Metro Station Exit C | Line 5 | 923 m | ≈ 11min | 120.147107, 30.316503 |
| Xi An Temple Station | Line 3 | 930 m | ≈ 11min | 120.148795, 30.299974 |
| Xiangji Temple Metro Station Entrance | Line 3 | 946 m | ≈ 11min | 120.148445, 30.299781 |
| Qingchen Bridge East Metro Station Exit D | Line 5 | 980 m | ≈ 12min | 120.148690, 30.316894 |
| Gongchen Bridge East Station | Line 5 | 989 m | ≈ 12min | 120.147977, 30.317061 |
| Qian Cheng Bridge East Metro Station Exit B | Line 5 | 1003 m | ≈ 12min | 120.147176, 30.317225 |
| Xi'an Museum Metro Station Exit D | Line 3 | 1005 m | ≈ 12min | 120.149575, 30.299438 |
| Gongchen Bridge East Metro Station Exit A | Line 5 | 1015 m | ≈ 12min | 120.148402, 30.317256 |
| Xiangji Temple Metro Station Exit C | Line 3 | 1016 m | ≈ 12min | 120.149107, 30.299240 |
| Qī Gǔ Dēng Station | Under Construction Line 15 | 1282 m | ≈ 16min | 120.152687, 30.318634 |
| Shan Xian Metro Station Exit D1 | Line 5 | 1459 m | ≈ 18min | 120.158713, 30.316562 |