Wantong Center

Gongshu • Wantong Center
(Wantor Center / zhè jiāng shěng háng zhōu shì gǒng shù qū wàn tōng zhōng xīn)

Monthly Rent
¥4100
Size
50m²
Layout
1 Bed 1 Living Room 1 Bath

Property Description

Property Highlights

Close To Metro Station

Basic Information

Floor: low
Building Type: Low-rise Apartment
Orientation: South

Rental Terms

Deposit: ¥4100
Management Fee: ¥0
Payment Terms: Quarterly payment
Furniture: Complete furniture

Amenities & Facilities

Basic Appliances
AC
Washer
Fridge
TV
Premium Features
Digit Lock
Furniture
Bed
Wantong Center

Wantong Center

Wantor Center / zhè jiāng shěng háng zhōu shì gǒng shù qū wàn tōng zhōng xīn
Learn More About This Compound
Community:
Address: , ,
Year Built: 2014
Total Buildings: 5
Total Units: 1201
Parking Spaces: 499
Management Fee: ¥0/m²
Developer:

Neighborhood Information

Gongchenqiao Subdistrict is named after the Ming Dynasty stone arch bridge that spans the canal. It was established in August 1954 and is a subdistrict under the jurisdiction of Gongshu District, Hangzhou City. Gongchenqiao Subdistrict is located in the central-northern part of Gongshu District, Hangzhou City. It is the location of the Gongshu District Committee and District Government. The Beijing-Hangzhou Grand Canal runs through the jurisdiction, dividing the subdistrict into the east and west sides. The eastern part is adjacent to Shangtang Subdistrict in the north and Shangtang Subdistrict in the east, while the western part connects with Xiangfu Subdistrict and Hemu Subdistrict, and the south is linked to Xiaohe Subdistrict.

Nearby Metro Stations

Station Line Distance Walk Time Coordinates
Daxuan Metro Station Exit C1 Line 3 109 m ≈ 1min 120.148099, 30.307949
Biguan Metro Station Exit C2 Line 3 136 m ≈ 1min 120.147223, 30.306991
Da Guan Metro Station Exit D2 Line 3 197 m ≈ 2min 120.147513, 30.306479
Da Guan Station Line 3 210 m ≈ 2min 120.149143, 30.307815
Da Guan Metro Station Exit D1 Line 3 218 m ≈ 2min 120.148638, 30.306841
Da Guan Metro Station Exit B Line 3 248 m ≈ 3min 120.149585, 30.308373
Da Guan Metro Station Exit A Line 3 290 m ≈ 3min 120.150023, 30.308080
Xiangji Temple Metro Station Exit A Line 3 822 m ≈ 10min 120.148296, 30.300887
Xiangji Temple Metro Station Exit B Line 3 847 m ≈ 10min 120.147975, 30.300627
Gongchen Bridge East Metro Station Exit C Line 5 923 m ≈ 11min 120.147107, 30.316503
Xi An Temple Station Line 3 930 m ≈ 11min 120.148795, 30.299974
Xiangji Temple Metro Station Entrance Line 3 946 m ≈ 11min 120.148445, 30.299781
Qingchen Bridge East Metro Station Exit D Line 5 980 m ≈ 12min 120.148690, 30.316894
Gongchen Bridge East Station Line 5 989 m ≈ 12min 120.147977, 30.317061
Qian Cheng Bridge East Metro Station Exit B Line 5 1003 m ≈ 12min 120.147176, 30.317225
Xi'an Museum Metro Station Exit D Line 3 1005 m ≈ 12min 120.149575, 30.299438
Gongchen Bridge East Metro Station Exit A Line 5 1015 m ≈ 12min 120.148402, 30.317256
Xiangji Temple Metro Station Exit C Line 3 1016 m ≈ 12min 120.149107, 30.299240
Qī Gǔ Dēng Station Under Construction Line 15 1282 m ≈ 16min 120.152687, 30.318634
Shan Xian Metro Station Exit D1 Line 5 1459 m ≈ 18min 120.158713, 30.316562
Your Agent
Sherry
Sherry

Real Estate Agent

Call

13706712545

Schedule Viewing
Min: ¥5000 Max: ¥20000