Hangyucheng
Yuhang •
Tod Link
(HangYuCity / háng yǔ chéng)
Monthly Rent
¥6300
Size
127m²
Layout
4 Beds 2 Reception Rooms 2 Baths
Property Description
Brand new 4-bedroom apartment, with dishwasher, floor heating and oven, top floor
Property Highlights
Close To Metro Station
Open Balcony
Floor Heating
Digital Lock
Brand New
Basic Information
| Floor: | high |
| Building Type: | High-rise |
| Orientation: | South |
Rental Terms
| Deposit: | ¥6300 |
| Management Fee: | ¥0 |
| Payment Terms: | Quarterly payment |
| Furniture: | Complete furniture |
Amenities & Facilities
Basic Appliances
AC
Washer
Fridge
TV
Kitchen Facilities
Oven
DishWasher
GasStove
Hood
Steamer
Premium Features
FloorHeat
Dryer
Digit Lock
Furniture
DiningSets
Wardrobe
Bed
Sofa
CoffeeTable
TVtable
NightStand
Nearby Schools
- King's College School
Tod Link
HangYuCity / háng yǔ chéng
Learn More About This Compound| Community: | |
| Address: | , , |
| Year Built: | 2024 |
| Total Buildings: | 32 |
| Total Units: | 2954 |
| Parking Spaces: | 0 |
| Management Fee: | ¥0/m² |
| Developer: |
Neighborhood Information
Nearby Metro Stations
| Station | Line | Distance | Walk Time | Coordinates |
|---|---|---|---|---|
| Long Zhou Bei Lu Station Exit C | Line 3 | 217 m | ≈ 2min | 119.982422, 30.287626 |
| Longzhou Beilu Metro Station Exit D | Line 3 | 241 m | ≈ 3min | 119.983128, 30.287644 |
| Longzhou North Road Station Exit B | Line 3 | 272 m | ≈ 3min | 119.982224, 30.288144 |
| Longzhou North Road Station | Line 3 | 274 m | ≈ 3min | 119.983173, 30.287954 |
| Longzhou Beilu Metro Station Exit A | Line 3 | 342 m | ≈ 4min | 119.983737, 30.288390 |
| Wen Yi Xi Lu Station Exit B3 | Line 3 | 996 m | ≈ 12min | 119.980241, 30.276868 |
| Wen Yi Xi Lu Station Exit B2 | Line 3 | 1106 m | ≈ 13min | 119.981033, 30.275786 |
| Wen Yi Xi Lu Metro Station Exit B1 | Line 3 | 1127 m | ≈ 14min | 119.980040, 30.275702 |
| Wen Yi Xi Lu Station | Line 3 | 1197 m | ≈ 14min | 119.980650, 30.274990 |
| Wen Yi Xi Lu Metro Station Exit A | Line 3 | 1227 m | ≈ 15min | 119.980900, 30.274705 |
| West Railway Station Metro Station Exit H | Line 19; Line 3 | 1236 m | ≈ 15min | 119.986566, 30.296101 |
| West Railway Station Metro Station Exit G | Line 19; Line 3 | 1286 m | ≈ 16min | 119.986305, 30.296658 |
| West Railway Station Metro Station Exit J | Line 19; Line 3 | 1309 m | ≈ 16min | 119.986893, 30.296690 |
| Wen Yi Xi Lu Metro Station Exit E | Line 3 | 1335 m | ≈ 16min | 119.981327, 30.273707 |
| West Railway Station Metro Station Entrance F | Line 19; Line 3 | 1357 m | ≈ 16min | 119.986389, 30.297305 |
| Wen Yi Xi Lu Station Exit C | Line 3 | 1371 m | ≈ 17min | 119.980235, 30.273463 |
| West Railway Station Metro Station K Entrance | Line 19; Line 3 | 1374 m | ≈ 17min | 119.986833, 30.297340 |
| West Railway Station Station | Under Construction Metro Station Line 12 North Segment; Line 19; Line 3 | 1421 m | ≈ 17min | 119.986523, 30.297877 |
| Wen Yi Xi Lu Metro Station Exit D1 | Line 3 | 1422 m | ≈ 17min | 119.981407, 30.272914 |
| Wen Yi Xi Lu Station Exit D2 | Line 3 | 1463 m | ≈ 18min | 119.980460, 30.272606 |