Tod Link

The cross of Longzhou North Road and Qianshenmiao Street

Basic Information

District
Yuhang
Year Built
2024
Total Buildings
32
Total Units
2954
Property Management
Long Lake Property Services Group Co., Ltd. Hangzhou Branch
Greening Rate
30%
Size Range
107-229 sqm m²
Available Types
3=4 brs

About This Compound

Compound built in 2025
The compound features in 2 sections, total 33 buildings with green landscape.
The main layout is 106sqm with 3 bedrooms and 127 to 229sqm with 4 bedrooms.
2 km to the West Railway Station.
0.1 km to the Longzhou North Rd metro station of metro line 3.

Location & Transportation

Nearby Metro Stations

Station Line Distance Walk Time
Long Zhou Bei Lu Station Exit C Line 3 217 m ≈ 2min
Longzhou Beilu Metro Station Exit D Line 3 241 m ≈ 3min
Longzhou North Road Station Exit B Line 3 272 m ≈ 3min
Longzhou North Road Station Line 3 274 m ≈ 3min
Longzhou Beilu Metro Station Exit A Line 3 342 m ≈ 4min
Wen Yi Xi Lu Station Exit B3 Line 3 996 m ≈ 12min
Wen Yi Xi Lu Station Exit B2 Line 3 1106 m ≈ 13min
Wen Yi Xi Lu Metro Station Exit B1 Line 3 1127 m ≈ 14min
Wen Yi Xi Lu Station Line 3 1197 m ≈ 14min
Wen Yi Xi Lu Metro Station Exit A Line 3 1227 m ≈ 15min
West Railway Station Metro Station Exit H Line 19; Line 3 1236 m ≈ 15min
West Railway Station Metro Station Exit G Line 19; Line 3 1286 m ≈ 16min
West Railway Station Metro Station Exit J Line 19; Line 3 1309 m ≈ 16min
Wen Yi Xi Lu Metro Station Exit E Line 3 1335 m ≈ 16min
West Railway Station Metro Station Entrance F Line 19; Line 3 1357 m ≈ 16min
Wen Yi Xi Lu Station Exit C Line 3 1371 m ≈ 17min
West Railway Station Metro Station K Entrance Line 19; Line 3 1374 m ≈ 17min
West Railway Station Station Under Construction Metro Station Line 12 North Segment; Line 19; Line 3 1421 m ≈ 17min
Wen Yi Xi Lu Metro Station Exit D1 Line 3 1422 m ≈ 17min
Wen Yi Xi Lu Station Exit D2 Line 3 1463 m ≈ 18min