the cross of Huping and Pingshuidong Road
| Type | Size (m²) | Rent (RMB/month) |
|---|---|---|
| 5 Bedroom Apartment | 272-277 | ¥ 7000-8000 |
The Shenhua area is formed by the enclosed area of Sandun Road, Moganshan Road-Dengyun Road, Yuhang Tanghe, and Gudun Road, making it a popular sector in the main urban area of Hangzhou. There are two subway lines within the area, Line 2, which is already in operation, and Line 5, which is currently under construction. In terms of expressways, there is the under-construction Wen Yi Road underground passage and the already opened Zijingang Interchange and Zhi Tunnel. In terms of commercial facilities, Yintai City, Impressions City, and other commercial complexes have been in operation for several years.
| Station | Line | Distance | Walk Time |
|---|---|---|---|
| Harmony Metro Station Exit A | Line 5 | 302 m | ≈ 3 min |
| Harmony Metro Station Exit B | Line 5 | 325 m | ≈ 4 min |
| Harmony Metro Station Exit F | Line 10 | 328 m | ≈ 4 min |
| Harmony Metro Station Exit G1 | Line 10 | 370 m | ≈ 4 min |
| Harmony Metro Station Exit H | Line 10 | 381 m | ≈ 4 min |
| Harmony Metro Station Exit C | Line 10 | 391 m | ≈ 4 min |
| Harmony Metro Station Exit G2 | Line 10 | 411 m | ≈ 5 min |
| Harmony Metro Station Entrance | Line 5 | 417 m | ≈ 5 min |
| Harmony Metro Station Exit E1 | Line 5 | 421 m | ≈ 5 min |
| Harmony Metro Station Entrance | Line 5 | 485 m | ≈ 6 min |
| Harmony Metro Station Exit D1 | Line 5 | 522 m | ≈ 6 min |
| He Mu Station | Line 10; Line 5 | 526 m | ≈ 6 min |
| Harmony Metro Station Exit D2A | Line 5 | 630 m | ≈ 7 min |
| Harmony Metro Station Exit D2B | Line 5 | 654 m | ≈ 8 min |
| Anda Metro Station Exit D3A | Line 5 | 662 m | ≈ 8 min |
| Harmony Metro Station Exit D3B | Line 5 | 686 m | ≈ 8 min |
| Garden Village Metro Station Exit D4 | Line 10 | 721 m | ≈ 9 min |
| Harmony Metro Station Exit D5 | Line 5 | 756 m | ≈ 9 min |
| Harmony Metro Station Exit D4 | Line 5 | 760 m | ≈ 9 min |
| Garden City Metro Station Exit D5 | Line 10 | 793 m | ≈ 9 min |