No.450,Pingshui Road
| Type | Size (m²) | Rent (RMB/month) |
|---|---|---|
| 5 Bedroom Apartment | 272-277 | ¥ 7000-8000 |
The Shenhua area is formed by the enclosed area of Sandun Road, Moganshan Road-Dengyun Road, Yuhang Tanghe, and Gudun Road, making it a popular sector in the main urban area of Hangzhou. There are two subway lines within the area, Line 2, which is already in operation, and Line 5, which is currently under construction. In terms of expressways, there is the under-construction Wen Yi Road underground passage and the already opened Zijingang Interchange and Zhi Tunnel. In terms of commercial facilities, Yintai City, Impressions City, and other commercial complexes have been in operation for several years.
| Station | Line | Distance | Walk Time |
|---|---|---|---|
| Ping Water Street Metro Station Exit B | Line 5 | 373 m | ≈ 4 min |
| Ping Shui Jie Metro Station Exit C | Line 5 | 428 m | ≈ 5 min |
| Ping Shui Jie Metro Station Entrance | Line 5 | 437 m | ≈ 5 min |
| Ping Wu Street Station | Line 5 | 478 m | ≈ 5 min |
| Ping Shui Street Metro Station Exit D | Line 5 | 533 m | ≈ 6 min |
| Ping Water Street Metro Station Exit A | Line 5 | 537 m | ≈ 6 min |
| San Bao Metro Station Exit A | Line 2 | 896 m | ≈ 11 min |
| Sanba Metro Station Exit G1 | Line 5 | 898 m | ≈ 11 min |
| Sanba Metro Station Exit B1 | Line 2 | 928 m | ≈ 11 min |
| Sanba Metro Station Exit G2 | Line 5 | 935 m | ≈ 11 min |
| San Ba Metro Station Exit B2 | Line 2 | 962 m | ≈ 12 min |
| Sanba Metro Station Exit B4 | Line 2 | 983 m | ≈ 12 min |
| San Bao Station | Line 2; Line 5 | 983 m | ≈ 12 min |
| San Ba Metro Station Exit F | Line 2 | 988 m | ≈ 12 min |
| Sanba Metro Station Exit C | Line 5 | 994 m | ≈ 12 min |
| San Ba Metro Station Exit D | Line 2 | 1015 m | ≈ 12 min |
| San Ba Metro Station Exit B3 | Line 2 | 1018 m | ≈ 12 min |
| Sanba Metro Station Exit E | Line 2 | 1023 m | ≈ 12 min |
| Harmony Metro Station Exit D5 | Line 5 | 1108 m | ≈ 13 min |
| Harmony Metro Station Exit D4 | Line 5 | 1124 m | ≈ 14 min |