Yunsha Lianyuan

Binjiang • Cloud Mansion Linked Garden
(Cloud Tower Linked Garden / zhè jiāng shěng háng zhōu shì bīn jiāng qū yún shà lián yuán)

Monthly Rent
¥6900
Size
89m²
Layout
3 Beds 2 Reception Rooms 1 Bath

Property Description

Property Highlights

Close To Metro Station

Basic Information

Floor: low
Building Type: Low-rise Apartment
Orientation: South

Rental Terms

Deposit: ¥6900
Management Fee: ¥0
Payment Terms: Quarterly payment
Furniture: Complete furniture

Amenities & Facilities

Basic Appliances
AC
Washer
Fridge
TV
Kitchen Facilities
GasStove
Premium Features
Digit Lock
Furniture
DiningSets
Wardrobe
Bed
Sofa
CoffeeTable
TVtable
ShoeCabinet
NightStand
Desk
Drawers
Cloud Mansion Linked Garden

Cloud Mansion Linked Garden

Cloud Tower Linked Garden / zhè jiāng shěng háng zhōu shì bīn jiāng qū yún shà lián yuán
Learn More About This Compound
Community: Yun Xia Lian Yuan
Address: Guling Road West Xing Subway Station Exit B Walking 430 Meters, Binjiang District, Hangzhou City
Year Built: 2010
Total Buildings: 11
Total Units: 686
Parking Spaces: 600
Management Fee: ¥0/m²
Developer:

Neighborhood Information

Xixing Street is located within a 2-hour transportation radius from Shanghai, on the south bank of the Qiantang River in the central area of Binjiang District, Hangzhou City. It is adjacent to the Xiaoshan Economic and Technological Development Zone to the east, and borders the national-level high-tech zone and the provincial-level higher education park to the west. To the north, it is connected to the old city area of Hangzhou via the Qianjiang Third Bridge, highlighting its advantageous location. Covering a total area of 17.6 square kilometers, Xixing Street governs 13 communities with a total population of 87,032, including 37,656 migrants. The presence of Shanghai-Hangzhou, Zhejiang-Jiangxi, and Hangzhou-Ningbo railways, as well as the Jinghang and Zhedong canals, the Shanghai-Hangzhou-Ningbo and Hangzhou-Jinhua-Quzhou expressways, and the Hangzhou Xiaoshan InternationalWest Xing Subdistrict is located within the 2-hour transportation radius of Shanghai, at the center of Binjiang District, Hangzhou, on the southern bank of the Qiantang River. It is adjacent to the Xiaoshan Economic and Technological Development Zone to the east, borders a national-level high-tech zone and a Zhejiang provincial-level education park to the west, and connects to the old city area of Hangzhou across the Qiantang River through the Qianjiang Third Bridge to the north, showcasing a highly advantageous geographical location. Covering a total area of 17.6 square kilometers, West Xing Subdistrict administers 13 communities with a total population of 87,032, including 37,656 non-local residents. The subdistrict benefits from convenient transportation facilitated by the Shanghai-Hangzhou, Zhejiang-Jiangxi, and Hangzhou-Ningbo railways, the Beijing-Hangzhou, Zhejiang-Eastern Zhejiang, Shanghai-Hangzhou-Ningbo, and Hangzhou-Jinhua-Quzhou expressways, as well as the Hangzhou Xiaoshan International Airport. Situated on the eastern side of the Hangzhou High-tech Industrial Development Zone (Binjiang), West Xing Subdistrict is also the location of the Party Committee and government offices of the High-tech Zone, as well as the Binjiang District government.

Nearby Metro Stations

Station Line Distance Walk Time Coordinates
Xi Xin Metro Station Exit B Line 1 333 m ≈ 4min 120.220641, 30.187540
Xi Xing Metro Station Exit D Line 1 350 m ≈ 4min 120.220786, 30.186810
Xi Xing Station Line 1 360 m ≈ 4min 120.220429, 30.187295
Bin Kang Lu Station Exit B Line 1 769 m ≈ 9min 120.230646, 30.184439
Xi Ban Kang Lu Station Line 1; Line 5 834 m ≈ 10min 120.231003, 30.183864
Bin Kang Lu Station Exit E Line 5 860 m ≈ 10min 120.230307, 30.182803
Bin Kang Lu Metro Station Exit A Line 1 897 m ≈ 11min 120.231846, 30.183917
Bin Kang Lu Station Exit G Line 5 912 m ≈ 11min 120.230393, 30.182232
Bin Kang Lu Station Exit H Line 5 993 m ≈ 12min 120.231898, 30.182536
Jiang Huang Lu Station Entrance Line 5 1136 m ≈ 14min 120.214681, 30.182014
Jiang Hui Lu Station Entrance E4 Line 5 1159 m ≈ 14min 120.214481, 30.181900
Jiang Hu Lu Station Exit E3 Line 5 1267 m ≈ 15min 120.213836, 30.181032
Jiang Hu Lu Station Exit E2 Line 5 1274 m ≈ 15min 120.213054, 30.181835
Binhe Lu Station Exit D Line 1 1323 m ≈ 16min 120.217996, 30.199014
Jiang Hu Lu Station Under Construction Line 18; Line 5 1340 m ≈ 16min 120.212417, 30.181579
Jiang Hu Lu Station Exit E1 Line 5 1342 m ≈ 16min 120.212591, 30.181338
Bin He Lu Station Exit C Line 1 1348 m ≈ 16min 120.217409, 30.199002
Jiang Hu Lu Station Exit A1 Line 5 1366 m ≈ 17min 120.211893, 30.181864
Bin He Lu Station Line 1 1396 m ≈ 17min 120.217552, 30.199550
Jiang Hu Lu Station Exit D Line 5 1399 m ≈ 17min 120.211869, 30.181347
Your Agent
Sherry
Sherry

Real Estate Agent

Call

13706712545

Schedule Viewing
Min: ¥5000 Max: ¥20000