Shui An Feng Ting

Uptown • Acer Lakeside
(Waterfront Maple Court / zhè jiāng shěng háng zhōu shì shàng chéng qū shuǐ àn fēng tíng)

Monthly Rent
¥8000
Size
89m²
Layout
2 Beds 1 Living Room 1 Bath

Property Description

low floor, close to river, good maintenance

Basic Information

Floor: low
Building Type: High-rise
Orientation: South

Rental Terms

Deposit: ¥8000
Management Fee: ¥0
Payment Terms: Quarterly payment
Furniture: Complete furniture
Acer Lakeside

Acer Lakeside

Waterfront Maple Court / zhè jiāng shěng háng zhōu shì shàng chéng qū shuǐ àn fēng tíng
Learn More About This Compound
Community:
Address: , ,
Year Built: 2009
Total Buildings: 2
Total Units: 832
Parking Spaces: 0
Management Fee: ¥0/m²
Developer:

Neighborhood Information

Nearby Metro Stations

Station Line Distance Walk Time Coordinates
Yongjiang Lu Station Exit C3 Line 4 115 m ≈ 1min 120.188924, 30.222563
Yongjiang Lu Station Under Construction Line 18; Line 4 142 m ≈ 1min 120.189451, 30.223287
Yongjiang Road Metro Station Exit C2 Line 4 150 m ≈ 1min 120.188769, 30.222932
Yongjiang Lu Metro Station Exit C4 Line 4 174 m ≈ 2min 120.188199, 30.221936
Yuyuan Lu Metro Station Exit C1 Line 4 194 m ≈ 2min 120.189389, 30.223768
Yongjiang Lu Metro Station Exit D Line 4 204 m ≈ 2min 120.190611, 30.223866
Yuying Road Metro Station Exit B Line 4 239 m ≈ 2min 120.189739, 30.224242
Yong Jiang Lu Metro Station Exit C5 Line 4 253 m ≈ 3min 120.187379, 30.221836
Yongjiang Road Metro Station Exit A Line 4 318 m ≈ 3min 120.190857, 30.224863
Kinjiang Metro Station Exit D Line 1; Line 4 1147 m ≈ 14min 120.196996, 30.230465
Jin Jiang Metro Station Exit C1 Line 1; Line 4 1168 m ≈ 14min 120.196658, 30.230890
Jin Jiang Metro Station Exit E Line 1; Line 4 1191 m ≈ 14min 120.198436, 30.229959
Nanshi Bridge Metro Station Exit E Line 4 1194 m ≈ 14min 120.178659, 30.217707
Jinjiang Metro Station Exit C2 Line 1; Line 4 1227 m ≈ 15min 120.196485, 30.231616
Jin Jiang Station Line 1; Line 4 1233 m ≈ 15min 120.197458, 30.231125
Nansing Bridge Metro Station Exit A Line 4 1263 m ≈ 15min 120.177840, 30.217766
Kinheung Metro Station Exit B Line 1; Line 4 1265 m ≈ 15min 120.197360, 30.231536
Nan Xing Bridge Metro Station Exit D Line 5 1269 m ≈ 15min 120.178316, 30.216761
Jinjiang Metro Station Exit A Line 1; Line 4 1276 m ≈ 15min 120.198369, 30.231012
Nan Xing Bridge Station Line 4; Line 5 1324 m ≈ 16min 120.177384, 30.217295
Your Agent
Agnes
Agnes

Real Estate Agent

Call

15967109899

Schedule Viewing
Min: ¥5000 Max: ¥20000