Shengshi Qiantang

Jianggan • Prosperous Qiantang
(Prosperity Riverside Qingtang / zhè jiāng shěng háng zhōu shì shàng chéng qū shèng shì qián táng)

Monthly Rent
¥5400
Size
57m²
Layout
2 Beds 1 Living Room 1 Bath

Property Description

loft apartment, two bedrooms, close to metro station

Basic Information

Floor: low
Building Type: Low-rise Apartment
Orientation: North

Rental Terms

Deposit: ¥5400
Management Fee: ¥176
Payment Terms: Quarterly payment
Furniture: Complete furniture
Prosperous Qiantang

Prosperous Qiantang

Prosperity Riverside Qingtang / zhè jiāng shěng háng zhōu shì shàng chéng qū shèng shì qián táng
Learn More About This Compound
Community: Shengshi Qiantang
Address: Fuchun Road 899 Number C1 Exit of Jianghe Hui Subway Station is a 360-meter walk away., Shang Cheng Qu, Hangzhou City
Year Built: 2007
Total Buildings: 7
Total Units: 1173
Parking Spaces: 1430
Management Fee: ¥3.1/m²
Developer: Yi Tian Real Estate

Neighborhood Information

Qianjiang New Town is located in the southwest of Jianggan District, Hangzhou, on the north bank of the Qiantang River, approximately 4.5 kilometers from the West Lake Scenic Area and about 18 kilometers from Xiaoshan International Airport. Phase I covers an area extending east to the Qiantang River, south to the Fuxing area, west along Qiutao Road, and north to the Qiantang River Second Bridge and Genshan West Road, encompassing approximately 15.8 square kilometers. Phase II covers an area of 5.2 square kilometers, bordered by the Hangzhou-Ningbo Expressway to the west, Hemo Harbor to the east, Genshan East Road to the north, and the Qiantang River to the south.Since the G20 Hangzhou Summit in 2016, the light show in Qianjiang New Town has become a new cultural symbol for Hangzhou.

Nearby Metro Stations

Station Line Distance Walk Time Coordinates
Jiang He Hui Metro Station Exit C1 Line 9 147 m ≈ 1min 120.221878, 30.260622
Jianghe Hui Metro Station Exit C2 Line 9 176 m ≈ 2min 120.221320, 30.260775
Jianghe Hui Metro Station Exit A Line 9 189 m ≈ 2min 120.222094, 30.260998
Jiang He Hui Station Under Construction Line 15; Under Construction Line 9 237 m ≈ 2min 120.221398, 30.261374
Qianjiang Lu Station Exit D3 Line 2; Line 4 808 m ≈ 10min 120.214810, 30.255513
Qian Jiang Lu Metro Station Exit D4 Line 2; Line 4 858 m ≈ 10min 120.213923, 30.255991
Xi Jiang Lu Station Line 2; Line 4; Line 9 905 m ≈ 11min 120.213387, 30.255978
Qian Jiang Lu Metro Station Entrance Line 2; Line 4 907 m ≈ 11min 120.214332, 30.254527
Qian Jiang Lu Station Entrance D1 Line 2; Line 4 920 m ≈ 11min 120.213495, 30.255491
Qian Jiang Lu Metro Station Exit A Line 2; Line 4 926 m ≈ 11min 120.212880, 30.256584
Sanbao Metro Station Exit C Line 9 930 m ≈ 11min 120.226784, 30.266579
Qian Jiang Lu Station Exit D2 Line 2; Line 4 935 m ≈ 11min 120.213929, 30.254593
San Bao Metro Station Exit D Line 9 961 m ≈ 12min 120.228105, 30.266157
Qiantang Road Metro Station Exit C Line 2; Line 4 966 m ≈ 12min 120.212993, 30.255424
San Bao Metro Station Exit E Line 6 975 m ≈ 12min 120.228818, 30.265797
San Bao Station Line 6; Line 9 1013 m ≈ 12min 120.227958, 30.266822
Qian Jiang Lu Metro Station Exit B Line 2; Line 4 1053 m ≈ 13min 120.211678, 30.256102
San Bao Metro Station Exit B2 Line 9 1058 m ≈ 13min 120.227637, 30.267483
San Bao Metro Station Exit F Line 6 1080 m ≈ 13min 120.229268, 30.266718
Sanbao Metro Station Exit A Line 6 1086 m ≈ 13min 120.228560, 30.267263
Your Agent
Agnes
Agnes

Real Estate Agent

Call

15967109899

Schedule Viewing
Min: ¥5000 Max: ¥20000