Guiguan Dongfang

the intersection of Huanju Lane and Baimi Alley

Basic Information

District
Xiaoshan
Circle
Qianjiang shijicheng
Year Built
2024
Total Buildings
10
Total Units
764
Greening Rate
Size Range
272-483 sqm m²
Available Types
5-7 brs

About This Compound

Compound will be built in 2025, decorated by developer .
The compound has two sections, the east section are office buildings and the west sections has 4 residential buildings.
The main layouts are from 272-483sqm.
2.1km to Jiang Cheng Road metro station.
Compound Features and Facilities
Transportation
Popular Layouts
Clydesdale Real Estate (One branch of the Clydesdale Destination Services) is the best channel for you if you are searching for Hangzhou apartment, Hangzhou House or Hangzhou Serviced apartment!
We are the best Hangzhou apartment rental company building up by a team of professional and energetic leasing agents!

Location & Transportation

Nearby Metro Stations

Station Line Distance Walk Time
Fengbei Metro Station Exit A2 Line 6 622 m ≈ 7min
Fengbei Metro Station Exit A1 Line 6 653 m ≈ 8min
Fengbei Station Under Construction Line 15; Line 6 692 m ≈ 8min
Fengbei Metro Station Exit B2 Line 6 725 m ≈ 9min
Fengbei Metro Station Exit B1 Line 6 775 m ≈ 9min
Fengbei Metro Station Exit D Line 6 802 m ≈ 10min
Pinglan Road Metro Station Exit D2 Line 19 827 m ≈ 10min
Ping Lan Lu Station Exit D1 Line 19 834 m ≈ 10min
Huangbei Metro Station Exit C Line 6 843 m ≈ 10min
Ping Lan Lu Station Exit C2 Line 19 870 m ≈ 10min
Ping Lan Lu Station Exit C1 Line 19 875 m ≈ 10min
Xi Pu Lu Station Line 19 876 m ≈ 10min
Ping Lan Lu Station Exit A1 Line 19 898 m ≈ 11min
Ping Lan Lu Metro Station Exit A2 Line 19 898 m ≈ 11min
Pinglan Lu Station Exit B1 Line 19 928 m ≈ 11min
Pinglan Lu Station Exit B2 Line 19 939 m ≈ 11min
Asia Games Village Metro Station Exit D Line 6 1027 m ≈ 12min
Asia Games Village Metro Station Exit C Line 6 1035 m ≈ 12min
Asia Games Village Station Line 6 1105 m ≈ 13min
Asia Games Village Metro Station Exit B Line 6 1179 m ≈ 14min