Chuangzhan Mingdi

No.36,Jianbao Street

Basic Information

District
Uptown
Circle
Jiubao
Year Built
2023
Property Management
Residential Property Management
Greening Rate
30%
Size Range
272-483 sqm m²
Available Types
5-7 brs

About This Compound

Compound will be built in 2025, decorated by developer .
The compound has two sections, the east section are office buildings and the west sections has 4 residential buildings.
The main layouts are from 272-483sqm.
2.1km to Jiang Cheng Road metro station.
Compound Features and Facilities
Transportation
Popular Layouts
Clydesdale Real Estate (One branch of the Clydesdale Destination Services) is the best channel for you if you are searching for Hangzhou apartment, Hangzhou House or Hangzhou Serviced apartment!
We are the best Hangzhou apartment rental company building up by a team of professional and energetic leasing agents!

Location & Transportation

Nearby Metro Stations

Station Line Distance Walk Time
Jiu Bao Metro Station Exit A Line 1 533 m ≈ 6min
Jiu Ba Station Line 1 575 m ≈ 7min
Jiu Bao Metro Station Exit C Line 1 615 m ≈ 7min
Jiubao Metro Station Entrance Line 1 620 m ≈ 7min
Jiu Bao Metro Station Exit D Line 1 633 m ≈ 7min
Jiu Mu Lu Station Line 9 941 m ≈ 11min
Jiu Mu Lu Station Exit A Line 9 951 m ≈ 11min
Passenger Transportation Center Metro Station Exit C2 Line 1; Line 9 1038 m ≈ 12min
Passenger Transportation Center Metro Station Exit C1 Line 1; Line 9 1051 m ≈ 13min
Passenger Transport Center Metro Station Exit D Line 1; Line 9 1118 m ≈ 13min
Passenger Transportation Center Metro Station Exit B Line 1; Line 9 1149 m ≈ 14min
Jiu Mu Lu Station Exit B Line 9 1152 m ≈ 14min
Jiu Mu Lu Station Exit C Line 9 1161 m ≈ 14min
Passenger Transportation Center Metro Station Entrance Line 1; Line 9 1161 m ≈ 14min
Passenger Transportation Center Metro Station Exit D1 Line 1; Line 9 1202 m ≈ 15min
Passenger Transportation Center Station Line 1; Line 9 1247 m ≈ 15min
Passenger Transportation Center Metro Station Exit A Line 1; Line 9 1298 m ≈ 16min
Passenger Center Metro Station Exit E Line 1; Line 9 1340 m ≈ 16min
Jiu He Lu Metro Station Exit D Line 1 1362 m ≈ 17min
Jiu He Lu Metro Station Exit A Line 1 1369 m ≈ 17min

Available Properties