Shengbin Fu

the cross of Xiawan and Changle Road.

Basic Information

District
Gongshu
Circle
DeSheng
Year Built
2023
Total Buildings
6
Total Units
728
Greening Rate
Size Range
272-483 sqm m²
Available Types
5-7 brs

About This Compound

Compound will be built in 2025, decorated by developer .
The compound has two sections, the east section are office buildings and the west sections has 4 residential buildings.
The main layouts are from 272-483sqm.
2.1km to Jiang Cheng Road metro station.
Compound Features and Facilities
Transportation
Popular Layouts
Clydesdale Real Estate (One branch of the Clydesdale Destination Services) is the best channel for you if you are searching for Hangzhou apartment, Hangzhou House or Hangzhou Serviced apartment!
We are the best Hangzhou apartment rental company building up by a team of professional and energetic leasing agents!

Location & Transportation

Nearby Metro Stations

Station Line Distance Walk Time
Xiangji Temple Metro Station Exit D Line 3 352 m ≈ 4min
Xi'an Temple Metro Station Exit C Line 3 388 m ≈ 4min
Xiangji Temple Station Line 3 444 m ≈ 5min
Xiagu Temple Metro Station Entrance Line 3 467 m ≈ 5min
Xi An Temple Metro Station Exit A Line 3 535 m ≈ 6min
Xi An Temple Metro Station Exit B Line 3 547 m ≈ 6min
Qing Wang Lu Station Exit B Line 3 901 m ≈ 11min
Daxiang Metro Station Exit D1 Line 3 1037 m ≈ 12min
Xi Wang Lu Station Line 3 1047 m ≈ 13min
Da Guan Metro Station Exit D2 Line 3 1051 m ≈ 13min
Qiantang Road Metro Station Exit C Line 3 1075 m ≈ 13min
Chao Wang Lu Metro Station Exit A Line 3 1084 m ≈ 13min
Daxian Metro Station Exit C2 Line 3 1114 m ≈ 13min
Da Guan Station Line 3 1120 m ≈ 14min
Daxuan Metro Station Exit A Line 3 1124 m ≈ 14min
Da Guan Metro Station Exit B Line 3 1167 m ≈ 14min
Da Guan Metro Station Exit C1 Line 3 1171 m ≈ 14min
Qi Huang Lu Station Exit D1 Line 3 1198 m ≈ 14min
Chao Wang Lu Station Exit E1 Line 3 1218 m ≈ 15min
Chao Wang Lu Station Exit E2 Line 3 1281 m ≈ 16min

Available Properties