Xinda Donglaifu

the cross of Tongde and Baishimiao Road

Basic Information

District
Uptown
Year Built
2021
Total Buildings
6
Total Units
356
Property Management
Hangzhou Xinyu Real Estate Management Co., Ltd.
Greening Rate
31%
Size Range
272-483 sqm m²
Available Types
5-7 brs
Developer

About This Compound

Compound will be built in 2025, decorated by developer .
The compound has two sections, the east section are office buildings and the west sections has 4 residential buildings.
The main layouts are from 272-483sqm.
2.1km to Jiang Cheng Road metro station.
Compound Features and Facilities
Transportation
Popular Layouts
Clydesdale Real Estate (One branch of the Clydesdale Destination Services) is the best channel for you if you are searching for Hangzhou apartment, Hangzhou House or Hangzhou Serviced apartment!
We are the best Hangzhou apartment rental company building up by a team of professional and energetic leasing agents!

Location & Transportation

Nearby Metro Stations

Station Line Distance Walk Time
Ming Shi Lu Station Exit C2 Line 4 385 m ≈ 4min
Ming Shi Lu Station Exit D2 Line 4 397 m ≈ 4min
Mingshi Lu Metro Station Exit C1 Line 4 413 m ≈ 5min
Ming Shi Lu Metro Station Exit D1 Line 4 476 m ≈ 5min
Ming Shi Lu Station Line 4 476 m ≈ 5min
Ming Shi Lu Metro Station Exit B2 Line 4 536 m ≈ 6min
Ming Shi Lu Station Exit B1 Line 4 569 m ≈ 7min
Ming Shi Lu Metro Station Exit A Line 4 580 m ≈ 7min
Peng Bu Metro Station Exit A Line 1; Line 4 624 m ≈ 7min
Peng Bu Metro Station Exit B Line 1; Line 4 634 m ≈ 7min
Peng Bu Metro Station Exit D Line 1; Line 4 647 m ≈ 8min
Pengbu Station Line 1; Line 4 664 m ≈ 8min
Pengbu Metro Station Entrance Line 1; Line 4 673 m ≈ 8min
Peng Bu Metro Station Exit C Line 1; Line 4 741 m ≈ 9min
Railway East Station Metro Station Entrance Line 6 1139 m ≈ 14min
Railway East Station (East Plaza) Metro Station Exit J Line 6 1149 m ≈ 14min
East Railway Station Metro Station Exit F Line 6 1176 m ≈ 14min
East Railway Station (Dong Guangchang) Metro Station Line 19; Line 6 1218 m ≈ 15min
East Railway Station Metro Station Exit H2 Line 19 1229 m ≈ 15min
East Railway Station Metro Station Exit H1 Line 19 1237 m ≈ 15min

Available Properties