Hangcheng Future Center

the cross of Shuixiangbei Road and Lvding Road

Basic Information

District
Yuhang
Year Built
2023
Total Buildings
12
Total Units
1192
Property Management
China Resources
Greening Rate
31%
Size Range
118-240 sqm m²
Available Types
3-4 brs

About This Compound

Compound built in 2023.
There are 22 buildings for apartment and 8 building for office and hotel in this compound in total. All apartments are refined decorated by the developer with central AC. The residential buildings are separated into north and south section. Each section has 11 building.
There is MixC shopping center attached with the compound is being built. Where there will be many shops and restaurants.
The metro station of Lvting Road is in the mid of the two section, which can exchange for line 5, line 3 and line 16.

Location & Transportation

Nearby Metro Stations

Station Line Distance Walk Time
Green Tinge Road Station Line 16; Line 3; Line 5 29 m ≈ 0min
Green Tings Road Metro Station Exit A2 Line 16; Line 3; Line 5 56 m ≈ 0min
Greening Road Metro Station Exit B Line 16; Line 3; Line 5 63 m ≈ 0min
Greening Road Metro Station Exit A1 Line 16; Line 3; Line 5 88 m ≈ 1min
Green Tinging Road Metro Station Exit D2 Line 16; Line 3; Line 5 112 m ≈ 1min
Greening Road Metro Station Exit C Line 16; Line 3; Line 5 113 m ≈ 1min
Greening Road Metro Station Exit D1 Line 16; Line 3; Line 5 124 m ≈ 1min
Creative Road Metro Station Exit B2 Line 3 820 m ≈ 10min
Chuang Ming Lu Metro Station Exit B3 Line 3 891 m ≈ 11min
Chuang Ming Lu Metro Station Exit B1 Line 3 966 m ≈ 12min
Chuang Ming Lu Station Line 3 988 m ≈ 12min
Chuang Ming Lu Station Exit C Line 3 1003 m ≈ 12min
Chuang Ming Lu Station Exit D Line 3 1125 m ≈ 14min
Chuang Ming Lu Metro Station Exit A Line 3 1159 m ≈ 14min
Gechang Metro Station Exit C Line 5 1209 m ≈ 15min
Gexiang Metro Station Exit D Line 5 1251 m ≈ 15min
Ge Alley Station Line 5 1286 m ≈ 16min
Ge Alley Metro Station Exit B Line 5 1325 m ≈ 16min
Ge Alley Metro Station Exit A Line 5 1358 m ≈ 16min