Star Green Wave Court

the cross of Haiqing and Benjing Ave.

Basic Information

District
Xiaoshan
Year Built
2023
Total Buildings
5
Total Units
460
Property Management
Hangzhou Binjiang Real Estate Management Company Limited
Greening Rate
35%
Size Range
108-139 sqm m²
Available Types
3-4 brs

About This Compound

1. Compound built in 2023.
2. the compound has totally 5 buildings from 25F-26F and 444 families. The main layouts are 3 bedrooms apartment of 108sqm and 4 bedrooms apartment of 127sqm-139sqm.
3. The compound features outdoor pool, children play ground and gym area.
4. The compound is close to SKP and metro line 6.

Location & Transportation

Nearby Metro Stations

Station Line Distance Walk Time
Fengbei Metro Station Exit D Line 6 517 m ≈ 6min
Fengbei Metro Station Exit C Line 6 547 m ≈ 6min
Qian Jiang Century City Metro Station Exit A2 Line 2 582 m ≈ 7min
Qianjiang Century City Metro Station Exit H2A Line 2 595 m ≈ 7min
Fengbei Metro Station Exit A1 Line 6 646 m ≈ 8min
Qianjiang Century City Metro Station Exit A1 Line 2 646 m ≈ 8min
Hong Beizhan Station Exit B1 Line 6 665 m ≈ 8min
Qian Jiang Century City Station Line 2; Line 6 666 m ≈ 8min
Qianjiang Century City Metro Station Exit H1 Line 2 668 m ≈ 8min
Fengbei Station Under Construction Line 15; Line 6 672 m ≈ 8min
Fengbei Metro Station Exit A2 Line 6 689 m ≈ 8min
Qian Jiang Century City Metro Station Exit G Line 2 700 m ≈ 8min
Qian Jiang Century City Metro Station Exit B Line 2 734 m ≈ 9min
Qianjiang Century City Metro Station Exit F2 Line 6 740 m ≈ 9min
Shengbei Metro Station Exit B2 Line 6 751 m ≈ 9min
Ying Feng Lu Metro Station Exit A Line 2 759 m ≈ 9min
Qiantang Century City Metro Station Exit C Line 2 776 m ≈ 9min
Qian Jiang Century City Metro Station Exit F1 Line 6 797 m ≈ 9min
Ying Feng Lu Station Exit B Line 2 806 m ≈ 10min
Ying Feng Lu Station Under Construction Line 15; Line 2 814 m ≈ 10min