Zhegang International

Zijinghua Road

Basic Information

District
Westlake
Year Built
2018
Total Buildings
2
Total Units
1729
Parking Spaces
2391
Property Management
Zhejiang Green Rise Real Estate Service Co., Ltd.
Greening Rate
15%
Size Range
272-483 sqm m²
Available Types
5-7 brs
Developer

About This Compound

Compound will be built in 2025, decorated by developer .
The compound has two sections, the east section are office buildings and the west sections has 4 residential buildings.
The main layouts are from 272-483sqm.
2.1km to Jiang Cheng Road metro station.
Compound Features and Facilities
Transportation
Popular Layouts
Clydesdale Real Estate (One branch of the Clydesdale Destination Services) is the best channel for you if you are searching for Hangzhou apartment, Hangzhou House or Hangzhou Serviced apartment!
We are the best Hangzhou apartment rental company building up by a team of professional and energetic leasing agents!

Location & Transportation

Nearby Metro Stations

Station Line Distance Walk Time
Xia Long Wei Metro Station Exit B Line 2 295 m ≈ 3min
Ha Long Wharf Metro Station Exit C Line 2 318 m ≈ 3min
Xia Long Wa Station Line 2 324 m ≈ 4min
Xia Longwei Metro Station Exit A Line 2 349 m ≈ 4min
Xia Longwei Metro Station Exit D Line 2 363 m ≈ 4min
Sanba Metro Station Exit B4 Line 2 851 m ≈ 10min
San Bao Metro Station Exit B3 Line 2 903 m ≈ 11min
Sanba Metro Station Exit B2 Line 2 924 m ≈ 11min
Sanba Metro Station Exit B1 Line 2 1025 m ≈ 12min
San Bao Metro Station Exit C Line 5 1087 m ≈ 13min
San Duan Metro Station Exit C Line 2 1095 m ≈ 13min
San Duan Metro Station Exit D Line 2 1107 m ≈ 13min
San Bao Metro Station Exit A Line 2 1153 m ≈ 14min
San Ba Station Line 2; Line 5 1154 m ≈ 14min
San Duan Station Line 2 1171 m ≈ 14min
San Ba Metro Station Exit D Line 2 1197 m ≈ 14min
San Duan Metro Station Entrance Line 2 1205 m ≈ 15min
San Bao Metro Station Exit G1 Line 5 1211 m ≈ 15min
San Ba Metro Station Exit G2 Line 5 1212 m ≈ 15min
San Duan Metro Station Exit B Line 2 1235 m ≈ 15min