Qianshuiwan City Garden

No.214,Moganshan Road

Basic Information

District
Gongshu
Circle
HuShu
Year Built
2004
Total Buildings
22
Total Units
1548
Parking Spaces
1340
Property Management
Hangzhou Near Lake Property Management Company Limited
Greening Rate
35%
Size Range
80-220 sqm m²
Available Types
2-4 brs
Developer

About This Compound

Compound built in Oct 2006
The compound was built by Vanke Developer, a famous developer in China Mainland. The compound features in total 39 buildings, with especially mark that Block 1-12 are built along side the west side which is east bank of the river, with those apartments mostly can see a fantastic view of the river without any block.
The mayjor layouts of the apartments are 2-4 room layouts.
Located next to the Hangzhou International School this compound is a good selecton for parent with kids going to the school. and near by the living facilities such as clinic and fresh food wet market are increasingly mature so life here is more convenient.
Safe compound with security checks into the compound and into the each block. Quite environment gives the tenants the utmost inner peace from the city.

Location & Transportation

Nearby Metro Stations

Station Line Distance Walk Time
Shentangqiao Metro Station Exit A Line 2 654 m ≈ 8min
Shentangqiao Metro Station Exit B Line 2 680 m ≈ 8min
Shentangqiao Station Line 19; Line 2 760 m ≈ 9min
Shen Tang Bridge Metro Station Exit D Line 2 792 m ≈ 9min
Shen Tang Bridge Metro Station Exit C1 Line 2 802 m ≈ 10min
Shentangqiao Metro Station Exit C2 Line 2 812 m ≈ 10min
Xia Ning Bridge Metro Station Exit C Line 2 869 m ≈ 10min
Shentangqiao Metro Station Exit C3 Line 2 870 m ≈ 10min
Xia Ning Qiao Station Line 2 940 m ≈ 11min
Shen Tang Qiao Metro Station Exit E Line 19 980 m ≈ 12min
Chao Wang Lu Station Exit C Line 3 990 m ≈ 12min
Qi Wang Lu Station Exit D1 Line 3 993 m ≈ 12min
Qiantang Road Metro Station Exit D2 Line 3 1011 m ≈ 12min
Shentangqiao Metro Station Exit F2 Line 19 1014 m ≈ 12min
Xi Wang Lu Station Line 3 1014 m ≈ 12min
Shen Tang Qiao Metro Station Exit F1 Line 19 1025 m ≈ 12min
Qing Wang Lu Station Exit B Line 3 1025 m ≈ 12min
Chao Wang Lu Station Exit A Line 3 1031 m ≈ 12min
Chao Wang Lu Station Exit E2 Line 3 1052 m ≈ 13min
Chao Wang Lu Station Exit E1 Line 3 1052 m ≈ 13min

Available Properties