Yunyue Bay

the cross of Santangguan Road and Jiuhe Road

Basic Information

District
Uptown
Circle
Genbei xincheng
Year Built
2020
Total Buildings
34
Total Units
1275
Greening Rate
33.01%
Size Range
45-199 sqm m²
Available Types
1-5 brs
Developer

About This Compound

Compound built in 2020
The compound features in 3 sections. Building 1 to 5 are commercial buildings, building 6 to 29 are high flat apartments while building 30 to 39 are townhouse.
The main layouts are loft apartments of about 45 sqm, 3 bedrooms flat apartment of 118 sqm and 142 sqm with 4 bedrooms.- 3 km to the Hangzhou East Railway Station.
0.3 km to the nearest metro station of metro line 1.

Location & Transportation

Nearby Metro Stations

Station Line Distance Walk Time
Qi Pao Metro Station Exit C Line 1 248 m ≈ 3min
Qi Bao Station Line 1 300 m ≈ 3min
Qi Bao Metro Station Exit D Line 1 311 m ≈ 3min
Qi Pao Metro Station Exit B Line 1 328 m ≈ 4min
Qi Pao Metro Station Exit A Line 1 363 m ≈ 4min
Ming Shi Lu Station Exit D2 Line 4 1359 m ≈ 16min
Jiu He Lu Station Exit B2 Line 1 1382 m ≈ 17min
Ming Shi Lu Station Exit D1 Line 4 1418 m ≈ 17min
Ming Shi Lu Metro Station Exit C2 Line 4 1420 m ≈ 17min
Jiu He Lu Station Exit B1 Line 1 1448 m ≈ 18min
Jiu He Lu Station Line 1 1474 m ≈ 18min
Ming Shi Lu Station Line 4 1478 m ≈ 18min
Jiuhua Lu Metro Station Exit C Line 1 1479 m ≈ 18min
Ming Shi Lu Station Exit C1 Line 4 1493 m ≈ 18min