Metropolis

the cross of Yuntang Street and Duhuixiang

Basic Information

District
Jianggan
Circle
Jingfang
Year Built
2018
Total Buildings
4
Total Units
653
Parking Spaces
715
Property Management
Hangzhou Vanke Property Service Company Limited
Greening Rate
30%
Size Range
272-483 sqm m²
Available Types
5-7 brs
Developer

About This Compound

Compound will be built in 2025, decorated by developer .
The compound has two sections, the east section are office buildings and the west sections has 4 residential buildings.
The main layouts are from 272-483sqm.
2.1km to Jiang Cheng Road metro station.
Compound Features and Facilities
Transportation
Popular Layouts
Clydesdale Real Estate (One branch of the Clydesdale Destination Services) is the best channel for you if you are searching for Hangzhou apartment, Hangzhou House or Hangzhou Serviced apartment!
We are the best Hangzhou apartment rental company building up by a team of professional and energetic leasing agents!

Location & Transportation

Nearby Metro Stations

Station Line Distance Walk Time
San Bao Metro Station Exit F Line 6 90 m ≈ 1min
Sanbao Metro Station Exit E Line 6 122 m ≈ 1min
San Bao Metro Station Exit A Line 6 181 m ≈ 2min
San Bao Metro Station Exit D Line 9 182 m ≈ 2min
San Bao Station Line 6; Line 9 207 m ≈ 2min
Sanbao Metro Station Exit B2 Line 9 268 m ≈ 3min
San Bao Metro Station Exit B1 Line 9 273 m ≈ 3min
San Bao Metro Station Exit C Line 9 311 m ≈ 3min
Yuhu Highway Metro Station Exit E Line 19 891 m ≈ 11min
Yude Lu Metro Station Exit F Line 19 896 m ≈ 11min
Yude Road Metro Station Exit D Line 19 911 m ≈ 11min
Jiang He Hui Metro Station Exit A Line 9 954 m ≈ 11min
Yiyuan Road Metro Station Exit C Line 9 972 m ≈ 12min
Jiang He Hui Station Under Construction Line 15; Under Construction Line 9 985 m ≈ 12min
Jiang He Hui Metro Station Exit C1 Line 9 996 m ≈ 12min
Jianghe Hui Metro Station Exit C2 Line 9 1028 m ≈ 12min
Wu Dao Station Line 19; Line 9 1044 m ≈ 13min
Yude Road Metro Station Exit A Line 9 1052 m ≈ 13min
Yuhu Road Metro Station Exit B Line 9 1101 m ≈ 13min
Dan Hua An Lu Metro Station Exit D Line 6 1155 m ≈ 14min

Available Properties