Bin Hai Wan Garden

Jiusha Avenue

Basic Information

District
Binjiang
Year Built
2015
Total Buildings
20
Total Units
200
Parking Spaces
200
Management Fee
¥12/m²
Greening Rate
Size Range
272-483 sqm m²
Available Types
5-7 brs
Developer
Hangzhou Wan Da Real Estate

About This Compound

Compound will be built in 2025, decorated by developer .
The compound has two sections, the east section are office buildings and the west sections has 4 residential buildings.
The main layouts are from 272-483sqm.
2.1km to Jiang Cheng Road metro station.
Compound Features and Facilities
Transportation
Popular Layouts
Clydesdale Real Estate (One branch of the Clydesdale Destination Services) is the best channel for you if you are searching for Hangzhou apartment, Hangzhou House or Hangzhou Serviced apartment!
We are the best Hangzhou apartment rental company building up by a team of professional and energetic leasing agents!

Compound Features

Close To Metro Station

Location & Transportation

Nearby Metro Stations

Station Line Distance Walk Time
Jiubu Metro Station Exit A Line 1 135 m ≈ 1min
Jiu Ba Metro Station Entrance Line 1 177 m ≈ 2min
Jiu bao Station Line 1 184 m ≈ 2min
Jiu Ba Metro Station Exit D Line 1 202 m ≈ 2min
Jiu Ba Metro Station Exit C Line 1 234 m ≈ 2min
Jiu Mu Lu Station Line 9 451 m ≈ 5min
Jiu Mu Lu Metro Station Exit A Line 9 454 m ≈ 5min
Jiu Mu Lu Station Exit B Line 9 647 m ≈ 8min
Jiu Mu Lu Station Exit C Line 9 659 m ≈ 8min
Passenger Center Metro Station Exit C2 Line 1; Line 9 856 m ≈ 10min
Passenger Center Metro Station Exit C1 Line 1; Line 9 864 m ≈ 10min
Passenger Center Metro Station Exit D Line 1; Line 9 929 m ≈ 11min
Passenger Transportation Center Metro Station Exit B Line 1; Line 9 996 m ≈ 12min
Passenger Transportation Center Metro Station Entrance Line 1; Line 9 1003 m ≈ 12min
Passenger Transportation Center Metro Station Exit D1 Line 1; Line 9 1007 m ≈ 12min
Passenger Center Station Line 1; Line 9 1075 m ≈ 13min
Passenger Transport Center Metro Station Exit A Line 1; Line 9 1139 m ≈ 14min
Passenger Transportation Center Metro Station Exit E Line 1; Line 9 1149 m ≈ 14min
Passenger Transport Hub Metro Station Exit F1 Line 1; Line 9 1197 m ≈ 14min
Passenger Transportation Center Metro Station Exit F2 Line 1; Line 9 1209 m ≈ 15min